Hunterston
You can find the applications on the planning portal using the following reference numbers:
- Solar PV Development: 26/00733/PP
- EV Hub Development: 26/00734/PP
Electric Vehicle Charging Hub
We are delighted to partner with Peel Ports Group on this project at the site of the former coal terminal in Ayrshire.
The proposed development will play an important role in the evolution of the land historically tied to fossil fuels into a future-focused green energy hub, with EV charging powered by renewable solar energy. This project supports the regeneration of the site while accelerating the transition to cleaner, more sustainable infrastructure.
Community Engagement
We held a local community drop in event at The Village Hall, Fairlie, on Thursday 11th June.
Members of the local community, and EV enthusiasts, received the opportunity to learn more about the project from our dedicated team, and share feedback.
If you were unable to attend the drop in event, and would like to share feedback, please find a form attached above, which can be returned to hunterston@greenwheelelectric.com
FAQs
Hunterston Charging Station
What is the location of the new charging station and why was this site chosen?
The Hunterston PARC site is situated in a great location for electric vehicle (EV) users in North Ayrshire. Rested near the Firth of Clyde, the site is conveniently located just off the A78, offering easy access to local businesses, communities, and travellers alike. Directions to the site can be found here.
How many charging points will the station have, and what types of chargers are available (e.g., Level 2, DC fast chargers)
At the Hunterston site, Greenwheel Electric Ltd plans to offer ultra-rapid charging and HGV charging bays. We are at the early stage of engaging with contractors and gathering feedback, but we aim to have ultra-rapid chargers across approximately 16 charging bays.
Will the charging station be accessible 24/7
Yes, the EV chargers will be accessible 24/7. The commercial amenities plan to be open during usual working hours. We’re still in the early stages, but we’ll share specific opening times closer to the opening date. Greenwheel Electric’s aim is to ensure the site is sensitively lit, creating a safe charging environment at any time of day or night. Good lighting and safe locations are important for all to improve sense of safety at charging stations.
What amenities are available at the station (i.e. toilets, seating areas, food options)?
The Hunterston site plans will offer a retail and amenities building with necessities such as accessible toilets and Wi-Fi, as well as outdoor seating. The development is in the early stages of the planning process, and our ambition is to work collaboratively with local people, community councils, and groups, local authorities, and elected representatives to hear directly from those near to the site what they would like to see in the local area, and to reflect these needs as much as possible in the final design of the site.
How does this new site contribute to the sustainability goals of North Ayrshire and wider area?
North Ayrshire Council is committed to protecting and improving the environment. As part of
this commitment, North Ayrshire Council will act to reduce its impact on the environment through concerted efforts to reduce carbon emissions. For this, the Council is committed to expanding EV infrastructure across the council estate in line with the Scottish Government’s ambition to move to zero-emission domestic transport. The EV charging hub at Hunterston actively contributes to the council’s and wider national climate change goals of reducing emissions in the transport sector.
What measures are in place to ensure the station operates with minimal environmental impact?
During the development Greenwheel Electric actively considers key environmental factors:
- Biodiversity: we ensure that environmental and ecological aspects are centered in our decision-making. We have undertaken ecological and habitat suitability surveys to be able to create biodiversity net gain areas as part of the final design. The design involves a planned green space which will grow native species to attract various animal and insect species.
- Flood Risk and Drainage: The site has a low probability of flooding; however, we are undertaking an assessment on flood risk and drainage strategy. We are currently awaiting results of sequential testing, and we will provide further details to a later stage.
- Ground Investigations: We have undertaken ground investigations which are an essential assessment to understand the ground condition and determine any risks and minimise impact.
- Transport: The road access and traffic management are designed by an independent specialist to ensure efficient traffic at – and around – the EV-hub.
How does the station support the local community and encourage EV adoption?
Offering high-end EV charging at a low cost has the ability to increase EV adoption, perfectly linking national goals of providing necessary EV infrastructure. In alignment with sustainability goals from North Ayrshire council, the EV hub is intended to inspire – and encourage – people to see EVs in a different light.
Are there any partnerships with local businesses or organisations to enhance the station's offerings?
We are looking forward to collaborating and working with local businesses, makers and producers to support the local economy and showcase products the region has to offer.
As we are in the early stages of planning, more details will be added at a later development stage.
EVs
Why EVs?
The EV infrastructure plays a crucial role in decarbonising the transport sector of the UK and Scotland. The transition from petrol and diesel to EV helps meet UK’s climate change obligations and improve air quality. The UK aims to phase out petrol and diesel car sales by 2030, while Scotland has a 2032 target, accelerating the need for a robust charging network and grid capacity. As of summer 2025, EVs make up 4.6% of all vehicles on the road in the UK. Newly registered EV cars registered in the UK have taken up 21.6% of the market share so far in 2025. This represents a threefold increase since 2021, and the numbers are expected to continue rising in the coming years.
What is the impact of electric vehicles on the environment compared to petrol and diesel vehicles?
The domestic transport sector is the largest emitting sector of the UK, with a 29% share of territorial greenhouse gas emissions (2023). The UK has set climate change targets to decarbonise the transport sector in which EV infrastructure takes an essential part in. The EV hub offers great support in improving the EV charging network and encouraging the uptake of EV cars on the road.
One of the key advantages of electric vehicles (EVs) is their significant potential to cut greenhouse gas emissions. Unlike petrol and diesel cars, EVs produce no tailpipe emissions, which means they don’t emit any CO2 directly into the air. This leads to much cleaner air and healthier streets for everyone.
To give some context, conventional petrol cars release around 165 grams of CO2 per kilometer, while diesel vehicles emit about 170 grams per kilometer. By comparison, EVs generate an average of just 50 grams of CO2 per kilometer when accounting for the electricity used.
Zero emissions is the result. None at the site, none at the vehicle, none at generation of electricity.
How are the UK and Scottish Governments preparing to support the energy demand from electric vehicles?
Both the UK Government and Scottish Government are taking steps to support the increased demand for electric vehicles, including investing in charging infrastructure and encouraging EV adoption. The UK aims to phase out petrol and diesel car sales by 2030, while Scotland has a 2032 target, accelerating the need for a robust charging network and grid capacity.
Most recently the UK Office for Zero Emissions Vehicles (OZEV) demonstrated their strong commitment by announcing £63 million of government spending allocated to EV infrastructure.
Are electric vehicles suitable for use in rural areas?
Where will the power come from to meet the electricity demands of electric vehicles in the UK?
Greenwheel Electric
What are Greenwheel Electric's plans for expanding its charging network in the coming years?
We are thrilled to be able to open our first site in 2026-2027 and have plans to expand our charging network in the coming years.
What role does Greenwheel Electric see itself playing in the UK's transition to electric mobility?