Hunterston

We are pleased to announce that we have submitted planning applications to North Ayrshire Council to build an EV Charging Hub and a solar project at the Hunterston PARC (Port and Resource Campus) site.

You can find the applications on the planning portal using the following reference numbers:

  • Solar PV Development: 26/00733/PP
  • EV Hub Development: 26/00734/PP
As this is a significant project, we are keen to hear the views of as many residents as possible. To do this, we invite you to complete a short survey to express your views on the site, as these are extremely valuable to us.

Electric Vehicle Charging Hub

We are delighted to partner with Peel Ports Group on this project at the site of the former coal terminal in Ayrshire.

The proposed development will play an important role in the evolution of the land historically tied to fossil fuels into a future-focused green energy hub, with EV charging powered by renewable solar energy. This project supports the regeneration of the site while accelerating the transition to cleaner, more sustainable infrastructure.

Electric Vehicle Charging Hub Working collaboratively to provide the local community with ultra-fast, low-cost EV charging powered by clean, renewable energy from solar power. If approved, we will also introduce high-quality amenities and services for the community. Solar Our proposals also include the installation of 5MW of solar power situated on a separate plot within Peel Ports Group’s land holding. This power has the potential to power the EV Hub as well as other businesses developing within Hunterston PARC.

Community Engagement

We held a local community drop in event at The Village Hall, Fairlie, on Thursday 11th June.

Members of the local community, and EV enthusiasts, received the opportunity to learn more about the project from our dedicated team, and share feedback. 

If you were unable to attend the drop in event, and would like to share feedback, please find a form attached above, which can be returned to hunterston@greenwheelelectric.com

FAQs

Hunterston Charging Station

What is the location of the new charging station and why was this site chosen?

The Hunterston PARC site is situated in a great location for electric vehicle (EV) users in North Ayrshire. Rested near the Firth of Clyde, the site is conveniently located just off the A78, offering easy access to local businesses, communities, and travellers alike. Directions to the site can be found here. 

At the Hunterston site, Greenwheel Electric Ltd plans to offer ultra-rapid charging and HGV charging bays. We are at the early stage of engaging with contractors and gathering feedback, but we aim to have ultra-rapid chargers across approximately 16 charging bays.

Yes, the EV chargers will be accessible 24/7. The commercial amenities plan to be open during usual working hours. We’re still in the early stages, but we’ll share specific opening times closer to the opening date. Greenwheel Electric’s aim is to ensure the site is sensitively lit, creating a safe charging environment at any time of day or night. Good lighting and safe locations are important for all to improve sense of safety at charging stations.

The Hunterston site plans will offer a retail and amenities building with necessities such as accessible toilets and Wi-Fi, as well as outdoor seating. The development is in the early stages of the planning process, and our ambition is to work collaboratively with local people, community councils, and groups, local authorities, and elected representatives to hear directly from those near to the site what they would like to see in the local area, and to reflect these needs as much as possible in the final design of the site.

North Ayrshire Council is committed to protecting and improving the environment. As part of
this commitment, North Ayrshire Council will act to reduce its impact on the environment through concerted efforts to reduce carbon emissions. For this, the Council is committed to expanding EV infrastructure across the council estate in line with the Scottish Government’s ambition to move to zero-emission domestic transport. The EV charging hub at Hunterston actively contributes to the council’s and wider national climate change goals of reducing emissions in the transport sector. 

During the development Greenwheel Electric actively considers key environmental factors:

  • Biodiversity: we ensure that environmental and ecological aspects are centered in our decision-making. We have undertaken ecological and habitat suitability surveys to be able to create biodiversity net gain areas as part of the final design. The design involves a planned green space which will grow native species to attract various animal and insect species.
  • Flood Risk and Drainage: The site has a low probability of flooding; however, we are undertaking an assessment on flood risk and drainage strategy. We are currently awaiting results of sequential testing, and we will provide further details to a later stage.
  • Ground Investigations: We have undertaken ground investigations which are an essential assessment to understand the ground condition and determine any risks and minimise impact.
  • Transport: The road access and traffic management are designed by an independent specialist to ensure efficient traffic at – and around – the EV-hub.

Offering high-end EV charging at a low cost has the ability to increase EV adoption, perfectly linking national goals of providing necessary EV infrastructure. In alignment with sustainability goals from North Ayrshire council, the EV hub is intended to inspire – and encourage – people to see EVs in a different light.

We are looking forward to collaborating and working with local businesses, makers and producers to support the local economy and showcase products the region has to offer.

As we are in the early stages of planning, more details will be added at a later development stage.

EVs

Why EVs?

The EV infrastructure plays a crucial role in decarbonising the transport sector of the UK and Scotland. The transition from petrol and diesel to EV helps meet UK’s climate change obligations and improve air quality. The UK aims to phase out petrol and diesel car sales by 2030, while Scotland has a 2032 target, accelerating the need for a robust charging network and grid capacity. As of summer 2025, EVs make up 4.6% of all vehicles on the road in the UK. Newly registered EV cars registered in the UK have taken up 21.6% of the market share so far in 2025. This represents a threefold increase since 2021, and the numbers are expected to continue rising in the coming years.

The domestic transport sector is the largest emitting sector of the UK, with a 29% share of territorial greenhouse gas emissions (2023). The UK has set climate change targets to decarbonise the transport sector in which EV infrastructure takes an essential part in. The EV hub offers great support in improving the EV charging network and encouraging the uptake of EV cars on the road.

One of the key advantages of electric vehicles (EVs) is their significant potential to cut greenhouse gas emissions. Unlike petrol and diesel cars, EVs produce no tailpipe emissions, which means they don’t emit any CO2 directly into the air. This leads to much cleaner air and healthier streets for everyone.

To give some context, conventional petrol cars release around 165 grams of CO2 per kilometer, while diesel vehicles emit about 170 grams per kilometer. By comparison, EVs generate an average of just 50 grams of CO2 per kilometer when accounting for the electricity used.

Zero emissions is the result. None at the site, none at the vehicle, none at generation of electricity.

Both the UK Government and Scottish Government are taking steps to support the increased demand for electric vehicles, including investing in charging infrastructure and encouraging EV adoption. The UK aims to phase out petrol and diesel car sales by 2030, while Scotland has a 2032 target, accelerating the need for a robust charging network and grid capacity.

Most recently the UK Office for Zero Emissions Vehicles (OZEV) demonstrated their strong commitment by announcing £63 million of government spending allocated to EV infrastructure.

Electric vehicles can be a practical and beneficial choice for many rural residents, despite factors such as longer travel distances and less readily available charging infrastructure compared to urban areas.
The electricity needed to power the site and charge the vehicles will come entirely from clean energy sources. This will be achieved through a combination of on-site renewable energy generation and additional green electricity supplied through the grid by a certified green energy provider.

Greenwheel Electric

What are Greenwheel Electric's plans for expanding its charging network in the coming years?

We are thrilled to be able to open our first site in 2026-2027 and have plans to expand our charging network in the coming years.

We aim to play a key role in the UK’s transition to electric mobility by developing a network of EV charging hubs powered entirely by renewable energy. By integrating ultra-fast, high-end, cost-effective charging with power sourced directly from wind and solar, we hope to help decarbonise transport while making EV charging more accessible across both urban and rural areas. We believe part of the decarbonising strategy is to enhance the user experience through partnerships with local businesses, creating community-focused charging destinations.

Contact us

If you have a query, please fill in the contact form. We will do our very best to get back to you as soon as we can within our business hours.
*Your personal details are not placed on the public record and will be held securely by Greenwheel Electric and their project partners in accordance with the GDPR 2016/679 data protection provisions. Information provided here will be used solely in connection with Greenwheel Electric's activities, consultation processes and any relevant planning applications.